РусскийEnglishУкраїнський
HomeSite mapContacts

Stages to create works project

Draft design

  • General layout scheme;
  • Floors plan;
  • Facades in colour;
  • Isometric projections;
  • Sectional drawings.

Working documentation

  • General layout;
  • Architectural part;
  • Structural part;
  • Heating;
  • Water supply and sewage system;
  • Air-conditioning;
  • Electric engineering part, electrical equipment.

A set volume of design documentation can be changed depending on project peculiarities. Architectural and construction documentation set availability is a minimal requirement for construction.

Project's elements

Our projects

 
Region: Kyiv region
 
Amount of houses: 499
 
Area of lot land: 119 Ha
 
 
Region: Kyiv region
 
Amount of houses: 1511
 
Area of lot land: 234 Ha
 
 
Region: Kyiv region
 
Amount of houses: 1979
 
Area of lot land: 300 Ha
 
 
Region: Kyiv region
 
Amount of houses: 596
 
Area of lot land: 80 Ha